Deck permits, plans and 3D design for Seattle-area builders

Layer 0.0 · Plan

Every deck starts with a plan.

Permit-ready plans, blueprints and 3D design for Seattle-area deck builders and homeowners. We know the local codes so you don't have to.

In Seattle, a deck more than 18 inches above grade needs a permit; other cities set their own thresholds — in Bellevue, for example, it is 30 inches. Roof decks, decks over living space and attached decks that serve as required egress usually need one regardless of height. Even when a building permit isn't required, zoning rules such as setbacks and lot coverage still apply.

  • Same-day estimates
  • Local code expertise
  • Contractor-friendly

Layer 1.0 · Footings

Built on the right footing.

Footing layout and details drawn on the plan set for your jurisdiction's code.

The Pacific Northwest's wet climate makes proper construction and inspections critical for safety and longevity. Proper footings, connections and guards reduce failure risk in our rain-heavy climate.

  • Footing layout on the plan
  • Structural details
  • Jurisdiction compliance review
  • Footing size, depth and post attachment detailed

Layer 2.0 · Framing

Framing that passes inspection.

Permit-ready construction drawings with accurate dimensions and structural details.

Every set is ready for city review and for contractor handoff, so the crew builds exactly what the reviewer approved. The ledger connection to the house is the item reviewers check most closely, and in our wet climate its flashing matters most.

  • Dimensioned plan views
  • Structural details
  • Material callouts
  • PDF and CAD formats
  • Ledger connection and flashing detail

Layer 3.0 · Decking

See it before you build it.

Visualize the deck before construction.

Great for homeowners making design decisions, and for contractors presenting options to clients. Fewer surprises once the boards are down.

  • Realistic 3D renderings
  • Material visualization
  • Design iteration support
  • Contractor coordination

Layer 4.0 · Details

The details inspectors look for.

Guards, stairs, pergolas and built-ins drawn to the standard reviewers expect.

Code compliance means materials and hardware appropriate for PNW weather. Permitted work avoids red flags during home sales and inspections, and unpermitted structures can complicate or void insurance claims.

  • Resale value
  • Insurance
  • Code compliance
  • Guards 36 in. min. where the deck is over 30 in. above grade
  • Stairs: 7¾ in. max riser, 10 in. min tread

Layer 5.0 · Exploded

Every member, accounted for.

Structural details and material callouts for every part of the deck.

From footings to guards, each member is sized, spaced and called out on the plan set, so the reviewer and the crew read the same drawing.

  • Posts and footings
  • Beams, joists and ledger
  • Decking and borders
  • Guards and stairs

Layer 6.0 · Drawings

From model to permit set.

Permit-ready drawings with accurate dimensions and structural details.

The same model becomes the plan set: site plan, footing and framing plans, connection, guard and stair details. Ready for city review and contractor handoff.

  • Site plan
  • Footing and framing plans
  • Ledger, guard and stair details
  • PDF and CAD formats

Layer 7.0 · Permit

Approved. Build with confidence.

We prepare and submit what's needed, navigate local codes and keep you updated through the review process.

Send your project details and we reply with a price and timeline within 1 business day. Recent Bellevue and Edmonds projects were permitted in one month; timelines vary by jurisdiction and scope.

  • Permit-ready plan sets
  • Submission and follow-up
  • Revision coordination

Services

Everything your deck needs to get approved.

  1. 01

    Permit submission

    We prepare the package and submit it to your jurisdiction, then handle reviewer comments until it’s approved.

    • Permit-ready plan sets
    • Jurisdiction compliance review
    • Submission and follow-up
    • Revision coordination
    Learn more
    Clay isometric model of a deck corner
  2. 02

    3D design

    Show your client the finished deck before construction starts. Fewer change orders, faster sign-off.

    • Realistic 3D renderings
    • Material visualization
    • Design iteration support
    • Contractor coordination
    Learn more
    Clay isometric model of a pergola over a deck
  3. 03

    Blueprints

    Permit-ready drawings with clean framing, footing and connection details.

    • Dimensioned plan views
    • Structural details
    • Material callouts
    • PDF and CAD formats
    Learn more
    Clay isometric model of deck framing

From sketch to permit in four steps.

  1. 01

    Send your project

    Address, a sketch or photos, and what you plan to build.

  2. 02

    Get price and timeline

    Within 1 business day.

  3. 03

    We draw and submit

    Plans, 3D design and the permit package.

  4. 04

    Approved

    We handle submission, follow-up and revision coordination until approval, then you build.

Plan set

What's in a deck permit set.

What a residential deck permit set typically includes.

  1. 01

    Site plan

    Property lines, setbacks, the deck footprint and stairs.

  2. 02

    Footing plan & detail

    Location and size of footings and posts, with footing depth and attachment hardware.

  3. 03

    Framing plan

    Dimensions, lumber size, spacing and span.

  4. 04

    Ledger / connection detail

    How the deck connects to the house, including the ledger flashing that matters most in our wet climate.

  5. 05

    Elevations

    The exterior walls the deck affects.

  6. 06

    Guard detail

    Material, height, baluster spacing and attachment.

  7. 07

    Stair & handrail detail

    Risers, treads, width and handrail height, if there are stairs.

Requirements vary by jurisdiction. We confirm what yours needs before we draw.

Inspections

Inspections, without surprises.

Most deck permits typically have three inspections. Requirements vary by jurisdiction, so we confirm yours.

  1. 01

    Footing

    Holes and footings before concrete.

  2. 02

    Framing

    Ledger, beams, joists and hardware, before decking hides them.

  3. 03

    Final

    Guards, stairs and the finished deck.

Build what the approved set shows. Field changes are a common reason a deck fails inspection.

Who we work with.

Contractors

Permit drawings and submission so your crew can stay on site. 3D design helps you present options to clients and win sign-off faster.

Get your price

Homeowners

See your deck before it's built, know what your city requires, and get a clear price and timeline within 1 business day.

Get your price

Recent wins.

Timelines vary by jurisdiction and scope.

  • Bellevue deck rebuild project

    Bellevue

    Deck rebuild

    Permit in one month

  • Edmonds deck addition project

    Edmonds

    Deck addition

    Permit in one month

  • Multi-level deck project

    Multi-level project

    3-story metal frame deck

    Deck design + permit

What builders and homeowners say.

“IP Design is a top-notch company when it comes to permit preparation and residential design services in the Greater Seattle area.”
— Google Review
“Ilia and his team are highly knowledgeable, detail-oriented, and make the entire permitting process seamless.”
— Google Review
“They truly make a complex process simple!”
— Google Review
Ilia, founder of IP Design

Meet Ilia.

I'm Ilia, founder of IP Design. I started this company because I saw how frustrating the permit process can be for homeowners and contractors alike.

With hands-on experience navigating Seattle-area building departments, I know what each jurisdiction expects and how to get your project approved efficiently.

Every project gets my personal attention. When you work with IP Design, you're working directly with me and my small, dedicated team.

Why Seattle homeowners and contractors choose us.

We understand local permitting inside and out.

  • Speed that respects quality

    Fast without cutting corners.

  • Clear communication

    Proactive updates and honest timelines.

  • No hidden fees

    Transparent pricing with no hidden fees.

References

Do I need a permit for my deck?

In most cases, yes. Specific rules vary by jurisdiction; here are the general guidelines.

Quick reference

  • SeattlePermit required if the deck is more than 18 in. above grade.
  • BellevuePermit with plan review if the deck is more than 30 in. above grade.
  • Other citiesThresholds and exemptions vary by city — see References.
  • All areasRoof decks and decks over living spaces typically require permits.
  • Attached decksUsually require permits regardless of height if serving as required egress.

Even when a building permit isn't required, zoning rules still apply. You'll need to verify setbacks, lot coverage limits, and any environmental restrictions that may affect your project.

In Seattle, homeowners may do their own drawings and a professional stamp is rarely required; what matters is a complete, clear set. SDCI: Decks

Why permits matter

  • SafetyProper footings, connections, and guards reduce failure risk in our rain-heavy climate.
  • Resale valuePermitted work avoids red flags during home sales and inspections.
  • InsuranceUnpermitted structures can complicate or void insurance claims.
  • Code complianceEnsures materials and hardware are appropriate for PNW weather.

City & county resources

Common questions

Photos of the existing deck or site, basic measurements, and a clear description of what you want to build or change. If you have sketches or old plans, those help too.

After you submit your project details, we review the scope, complexity, and jurisdiction requirements. Within 1 business day, we'll send you a clear quote and estimated timeline.

Scope complexity, number of revisions needed, jurisdiction-specific requirements, and whether you need just drawings or full submission support. We'll explain exactly what drives your quote.

We can do both. Some clients just need permit-ready drawings they'll submit themselves. Others want us to handle the full submission process. You choose what fits your project.

City review cycles (which vary by jurisdiction), revision rounds, and how quickly you can provide requested information. We'll give you realistic expectations upfront.

Yes. We're familiar with permit requirements across the Greater Seattle area, including Seattle, Everett, Tacoma, Bellevue, Edmonds, and surrounding cities.

Photos of the existing structure or site, any sketches you've made, existing plans (if you have them), and measurements. The more detail you provide, the more accurate our quote will be.

Minor clarifications are included. Significant scope changes may adjust the quote. We'll always discuss it with you before proceeding with revisions that affect cost.

Usually not for a typical residential deck. Seattle notes a stamp is rarely required. Some designs, such as unusual spans, heights or roof decks, may need structural calculations; we'll tell you upfront if yours does.

Typically footing, framing and final. We draw the set so each inspection has clear details to check against.

Get your price and timeline.

We reply within 1 business day.

Step 1 / 3

About your project

I am a (required)

Project typeoptional

Fields marked * are required.